The best builders in Brisbane
Three separate lists of Brisbane builders, each one checked against the QBCC licence register, with nobody paying to be included. Worth knowing first: in Queensland, any home building job over $3,300 needs a licensed builder, a written contract and home warranty insurance.
- Licence regulator
- QBCC
- Licence and warranty insurance needed over
- $3,300
- Maximum deposit, jobs $20,000+
- 5%
- Average new house cost (QLD)
- $1,987 per sqm
- Character homes
- Built before 1947
Choose the kind of builder you need
Each list is researched separately, so a great renovation builder isn't padded onto the new home list.
Renovation builders in Brisbane
Extensions, second storeys, raise and build under, and whole-house renovations.
See all 8New home builders in Brisbane
Custom and project homes, knockdown rebuilds and builds on tricky blocks.
See all 10Commercial builders in Brisbane
Fitouts, retail, medical, industrial and small multi-residential projects.
See all 10What building costs in Brisbane
Construction costs only. None of these figures include land.
| Project | Indicative cost | What the figure is |
|---|---|---|
| Ground floor extension | $2,500 to $6,000 per sqm | Queensland consumer guide (indicative). Outer suburbs sit at the low end, inner city character homes at the top. |
| Raise and build under | $110,000 to $270,000 | Our total of two Queensland ranges: the lift and restump ($30,000 to $70,000) plus enclosing and fitting out ($80,000 to $200,000). Indicative. |
| Kitchen renovation, mid-range | $25,000 to $45,000 | Brisbane consumer guide, typically $35,000. Includes GST. |
| Bathroom renovation, mid-range | $20,000 to $35,000 | Brisbane consumer guide, typically $27,000. Includes GST. |
| New house, average | $1,987 per sqm | Queensland average for new detached houses in 2024-25 (ABS data). Statewide, not Brisbane only. |
| New house, custom or architectural | $3,150 to $5,800 per sqm | Quantity surveyor rate (RLB, Queensland), excludes GST, site works and fees. |
| Office fitout | $2,200 to $4,200 per sqm | RLB Queensland rate, excludes GST. |
| Warehouse or industrial | $1,360 to $1,960 per sqm | RLB Queensland rate, single storey shed, excludes GST. |
Two things push Brisbane renovation prices up. Older timber houses in the inner suburbs cost more to extend than a brick house in the outer ring, and raising a Queenslander to build underneath is a big job of its own. Quantity surveyors RLB put Queensland tender price growth at 5% in 2025, with another 5% forecast for 2026.
Consumer guide figures are indicative. RLB rates exclude GST, land, site works and professional fees. The ABS average is a Queensland figure, not a Brisbane one.
Compare builders on the lists for renovation builders in Brisbane, new home builders in Brisbane and commercial builders in Brisbane, or read our building costs guide for how to budget.
Renovating a character home
Brisbane's pre-war houses come with their own planning rules.
Brisbane City Council's character properties are mainly buildings from before the end of 1946. Many sit in the Traditional building character overlay, which aims to keep the pre-1947 look of the street. Houses built before 1911 have to be kept, and extensions should not alter their original parts.
- In the overlay, you generally need planning approval for external extensions.
- Extensions that involve demolishing part of a pre-1947 house may be assessed against the overlay's demolition and design codes.
- Raising a house in the overlay generally doesn't need planning approval where the new height is no more than 9.5 metres (Council notes these rules can change).
- Internal-only renovations are unlikely to need planning approval.
Look your property up on Council's mapping before you brief a designer. If you're unsure, Council's planning line is 07 3403 8888. A builder who regularly works on Queenslanders will know these codes well; ask how many character renovations they have taken through approval in the last two years.
Approvals in Brisbane
Building approval and planning approval are two different things.
Building approval (formally a development permit for building work) comes from a licensed building certifier, not Council. Extensions, raising and renovations all need it. The certifier checks the plans, issues the approval and inspects the work at set stages. Builders often engage the certifier on your behalf, but you can appoint one yourself.
Planning approval comes from Brisbane City Council, and only when the design doesn't meet every acceptable outcome of the relevant City Plan code, or an overlay such as the character overlay applies. In that case you lodge a development application with Council.
Everything above is Brisbane City Council's City Plan. Greater Brisbane spreads across several councils, so if your block is outside the Brisbane City Council area, check that council's planning scheme instead.
Home warranty insurance and contracts in Queensland
Queensland's rules kick in early. Any residential building work over $3,300 (labour, materials and GST) needs a QBCC licensed contractor, a written, signed and dated contract, and QBCC home warranty insurance. That covers a bathroom as much as a new house.
- Home warranty insurance is arranged by the builder, who collects the premium from you and pays it to QBCC before work starts. It covers you if the builder doesn't finish, doesn't fix defects, or the building suffers subsidence, up to $200,000 for each category of loss ($300,000 with optional extra cover). It does not apply to commercial work.
- Deposits are capped: 10% for work from $3,301 to $19,999, and 5% for $20,000 or more. A builder asking for more is breaking the rules.
- Progress payments have to match the work done. For example, no more than 50% of the price (deposit included) until at least 50% of the work is finished.
- Cooling-off is 5 business days, starting the day after you receive the signed contract (and, for jobs of $20,000 or more, the QBCC Consumer Building Guide). Pulling out can cost you $100 plus the builder's reasonable out-of-pocket costs.
- Disputes go to QBCC first. QCAT will only hear a building dispute after QBCC has dealt with it.
Our home warranty insurance guide compares Queensland with the other states.
Checking a Queensland builder's licence
Search the QBCC register
Search by licence number, or by the person's or company's name. Use the number on the quote rather than the business name on the ute, because a trading name doesn't always match the licensee name. QBCC licensee register
Check it is current
The licence should show as current, not suspended or cancelled. The register shows the full licence history, so look for past suspensions or cancellations too.
Check the class fits the job
For a house, extension or renovation you want a builder class such as Builder low rise, Builder medium rise or Builder open. A trade licence (carpentry, for example) is not a builder licence.
Match it to the contract
The licensee name and number on the register should match the quote and the contract exactly. If you can't find them, call QBCC on 139 333 before you sign or pay anything. QBCC: find a licensed contractor
Building in Brisbane: common questions
How much does it cost to build a house in Brisbane?
The Queensland average for a new detached house in 2024-25 was $1,987 per square metre (ABS data), which is an average of $458,868 for a 231 sqm home, before land. Custom and architect designed homes run $3,150 to $5,800 per sqm on quantity surveyor rates. See the new home builders in Brisbane.
How much does it cost to raise a house in Brisbane?
Lifting and restumping to legal height typically costs $30,000 to $70,000 in Queensland. Enclosing and fitting out underneath adds roughly $80,000 to $200,000, so a full raise and build under lands around $110,000 to $270,000. These are indicative consumer guide figures.
Do I need council approval to renovate a character house in Brisbane?
Often, yes, for external work. If your house is in the Traditional building character overlay you generally need planning approval for external extensions. Internal-only renovations usually don't, and raising a house to no more than 9.5 metres may not. You still need building approval from a certifier.
Do I need a licensed builder for a renovation in Queensland?
Yes, if the work is worth more than $3,300 including labour, materials and GST. Plumbing, drainage and gas fitting need a licence at any value. Check the builder on the QBCC licensee register before you sign.
What is the maximum deposit a builder can ask for in Queensland?
For work of $20,000 or more the cap is 5% of the contract price. For work between $3,301 and $19,999 it is 10%. A higher deposit (up to 20%) is only allowed where off-site prefabrication makes up more than half the contract price.
Is there a cooling-off period on a building contract in Queensland?
Yes, 5 business days, starting the day after you receive the signed contract (and the QBCC Consumer Building Guide for jobs of $20,000 or more). If you cool off, the builder can keep $100 plus reasonable out-of-pocket costs.
Ready to talk to builders?
One form, up to three builders that suit your project.
Sources
- QBCC: Licensee register
- QBCC: When you need a licence
- QBCC: Builder low rise licence scope
- QBCC: Find a licensed contractor
- QBCC: What is home warranty insurance
- QBCC: Maximum amounts covered
- QBCC: Who pays home warranty and when
- QBCC: Domestic building contracts
- QBCC: Deposits and progress payments
- QBCC: Cooling-off period
- QBCC: Domestic building contract or payment dispute
- QBCC: Building inspections and approvals
- Brisbane City Council: Extensions, raising or renovations
- Brisbane City Council: Heritage and character properties
- Master Builders NSW: Cost of constructing Australian homes (ABS data, 2024-25)
- RLB Riders Digest 2026, Queensland
- The Quote Yard: Home extensions QLD 2026
- The Quote Yard: Restumping QLD 2026
- What's The Damage: Kitchen renovation cost Brisbane
- What's The Damage: Bathroom renovation cost Brisbane